The pile foundation engineering project for the Nigeria Itori 2×6000 tons/day production line is located in Itori Town, Nigeria, and is invested by Dangote Group.
The project commenced on April 28, 2024, and was completed on October 30, 2024, meeting the client’s timeline requirements with a total construction duration of 184 days. The scope of work included:
All completed piles fully comply with design and specification requirements, achieving a 100% pass rate in quality inspections.
Throughout the construction period, the project team prioritized the principle of "safety first". No safety incidents, occupational diseases, infectious disease cases, or environmental pollution events occurred, ensuring safe and civilized construction practices.