Geotechnical Investigation of Domestic Waste Incineration Power Plant of Renqiu City

2/5/2021 4:06:51 PM

Renqiu domestic waste incineration power plant is located 1.32 km north of Shi Village, Yilunbu Township, Renqiu City, Hebei Province. The main buildings are boiler room, steam turbine workshop, garbage pool, garbage unloading platform, comprehensive office building, dormitory, etc.

The field work period of this investigation is from May 1 to May 7, 2019. The project has been completed and accepted in December 2020.

On the basis of careful analysis of regional geological conditions, this project adopts drilling, in-situ test (standard penetration test, wave velocity test) and indoor test. A total of 126 boreholes have been drilled, with exploration depth from 30.0 m to 35.0 m and the total linear meter is 4,000.0 m.

There are many types of buildings (structures) and different types of building foundation and buried depth. The stratum of the proposed site is mainly Quaternary Alluvium, with weak soil locally and the spatial distribution of rock and soil is complex. The investigation methods adopted by the project have identified different types and distribution range of rock and soil. According to the results of in-situ test and geotechnical test, the engineering characteristics of foundation soil are scientifically analyzed and evaluated, which provides accurate, reliable and convenient technical parameters for the designers.

Add:NO.555 Huaian Road(west),Shijiazhuang City,Hebei Prov. P.C.:0502271   Tel:0311-66723100 66723200 Fax:0311-66723277  
Copy right:China Hebei Construction & Geotechnical Investigation Group Ltd. 2008